Orbiter-Forum  

Go Back   Orbiter-Forum > Far Side of the Moon > Spaceflight News
Register Blogs Orbinauts List Social Groups FAQ Projects Mark Forums Read

Spaceflight News Share news, stories, or discussions about government and private spaceflight programs; including ESA, ISS, NASA, Russian Space Program, Virgin Galactic, & more!

Reply
 
Thread Tools
Old 04-16-2013, 02:41 AM   #631
orb
O-F Administrator
Ninja
 
orb's Avatar

Videos

NASAMarshallTV:
orb is offline   Reply With Quote
Thanked by:
Old 04-23-2013, 11:33 AM   #633
orb
O-F Administrator
Ninja
 
orb's Avatar

Default

SPACE.com: NASA Must Pay for Plutonium Production to Fuel Deep-Space Probes

Space Politics: A busy week of NASA hearings
orb is offline   Reply With Quote
Thanked by:
Old 04-30-2013, 11:21 AM   #634
N_Molson
Addon Developer
 
N_Molson's Avatar

Default Apollo-Era Test Stand Being Prepared for SLS Core Stage Testing

Apollo-Era Test Stand Being Prepared for SLS Core Stage Testing

Before NASA's new Space Launch System (SLS) flies to space on its inaugural mission in 2017, it will fly in place at the agency's Stennis Space Center in Mississippi.

The B-2 Test Stand at Stennis, originally built to test Saturn rocket stages that propelled humans to the moon, is being completely renovated to test the SLS core stage in late 2016 and early 2017. The SLS stage, with four RS-25 rocket engines, will be installed on the stand for propellant fill and drain testing and two hot fire tests.

"These tests will help us understand how the spacecraft and engines behave and provide critical information for ensuring mission safety," said Rick Rauch, manager of the B-2 Test Stand Restoration, Buildout and Test Project. "After all, if there are problems, it's better to address them on the ground than in the air."

NASA is developing the SLS to send humans deeper into space than ever before -- to places like an asteroid and Mars. The SLS will launch NASA's Orion spacecraft and other payloads from the agency's Kennedy Space Center in Florida. The SLS program is managed at Marshall Space Flight Center in Huntsville, Ala. The first test flight of SLS will be in 2017. The rocket will send an uncrewed Orion spacecraft around the moon.

Stennis engineers were asked early in the SLS development process to determine the cost of restoring the B-2 stand to the condition needed for green run testing of the spacecraft’s core stage. A green run is the first time the engines are assembled into a single configuration with the core stage and fired at nearly full-power. This will test the compatibility and functionality of the system to ensure a safe and viable design.

The team spent 18 months conducting structural, mechanical and electrical system evaluations to assess the work needed since Apollo- and space shuttle-era testing.

Once the decision was made to proceed with core stage testing, Stennis engineers began converting original hand-drawn facility blueprints into computer models so design work could be completed. The actual renovation work was divided into three phases: restoration, buildout and special test equipment.

"In the first phase, we are restoring the test facility to its original design condition, where it could be used to test any number of stages," Rauch explained. "In the second phase, we will focus on building out the stand specifically to accommodate the SLS core stage. Then, in the third phase, we will complete the structural, mechanical and electrical interfaces required to test the core stage."

Each phase involves assessment, design and contractor support. In the end, no area of the stand will be left untouched, including all structural areas, as well as supporting mechanical, electrical and piping systems. The fundamental design of the stand will not be changed since it originally was built to test rocket stages.

However, the SLS stage is different from the Saturn stages and the space shuttle main propulsion test article installed and fired on the stand in earlier years. It is taller, standing 212 feet. To lift the stage into place, the derrick crane atop the stand must be extended 50 feet. The stand’s weight and thrust takeout structures also must be modified, and a higher support frame must be erected. The process will involve repositioning an existing 1.2 million pound frame about 20 feet and building a new 100-foot-tall superstructure atop it.

"The teams at the Stennis Space Center are doing a great job preparing the B-2 facility," said John Rector, SLS Stages Green Run test manager at Marshall. "We're on track to begin testing there in 2016. It's an exciting time for NASA as we establish a new national capability for future space exploration." Demolition work began on several test stand levels late last summer. Structural restoration has begun. Work is to be completed in time for delivery of the SLS core stage in 2016, with installation and testing to follow.

Source : www.nasa.gov
N_Molson is offline   Reply With Quote
Thanked by:
Old 05-08-2013, 09:38 PM   #636
orb
O-F Administrator
Ninja
 
orb's Avatar

Default

Aviation Week: Continued Sequestration Will Short-Circuit SLS
orb is offline   Reply With Quote
Old 06-06-2013, 09:46 PM   #637
N_Molson
Addon Developer
 
N_Molson's Avatar

Default

NASA : SLS Monthly Highlights (April 2013)

Content :

Quote:
- NASA Budget Proposal Lays Out Asteroid Retrieval Mission
- Spaceflight Partners: Avans Machine, Inc.
- Hot-Fire Tests Steering the Future of NASA’s Space Launch System Engines
- SLS Boosters Reach Program Milestone

NASA : SLS Monthly Highlights (May 2013)

Content :

Quote:
- Adapter ‘Flips’ for Progress toward 2014 Exploration Flight Test
- SLS Booster Center Segment Delivered to Utah Test Bay
- Spaceflight Partners: Votaw Precision Technologies
- Deputy Administrator Garver Visits NASA’s Gulf Coast Facilities
- A-1 Test Stand Houses First Full Engine in Nearly a Decade
N_Molson is offline   Reply With Quote
Reply

  Orbiter-Forum > Far Side of the Moon > Spaceflight News


Thread Tools

Posting Rules
BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts
Forum Jump


All times are GMT. The time now is 05:40 AM.

Quick Links Need Help?


About Us | Rules & Guidelines | TOS Policy | Privacy Policy

Orbiter-Forum is hosted at Orbithangar.com
Powered by vBulletin® Version 3.8.6
Copyright ©2000 - 2013, Jelsoft Enterprises Ltd.
Copyright ©2007 - 2012, Orbiter-Forum.com. All rights reserved.