MCC #7 was performed this morning with no additional engineering flags. The burn was a bit longer than originally calculated after our TEI burn, but was within the range of values allocated in our delta V budget. This was due to the fact that the original calculations were done while we were still in Saturn's SOI. MCC #8 and MCC #9 should be more in line with calculated values because we are now clear of all SOIs except the Sun.

All engineering boards are green at this time except for the 3 EHE's that showed slight overheating during the TEI burn. They have been shut down and will not be used during the remainder of SSTV-01 Mission 2.

The remaining milestones for this mission:
  • T+350 Days MCC #8
  • T+375 Days MCC #9
  • T+380 Days Begin Earth-Moon system phasing burns
  • T+392 Days Closest approach to Earth, Earth-Moon system capture burn
  • T+394 Days Initial Lunar orbit insertion burn
  • T+395 Days Arrival at Lunar Station and end of SSTV-01 Mission #2