Minor update in v3.3: fix MM data transfer bug to BurnTimeCalculator.Â
New in v3.2: Updated to use MMExt2 natively (so no more Error 126). No pre-requisites - however for best experience, please install ModuleMessagingExt v2.1 or later.Â
Base Sync is a utility to determine the best orbit for reentry to arrive at a target base, and then to determine the deorbit burn information. It predicts your closest approach on up to 99 orbits, and calculates the optimal plane change for direct over-flight of the base, and the retro-burn for re-entry on the desired angle, anticipation and entry interface altitude.Â