- Joined
- Mar 30, 2008
- Messages
- 178
- Reaction score
- 2
- Points
- 18
Hi Orbinauts !
A news about AMSO: Patch #2 is in preparation !
This patch will suppress a bad CTD caused by the lunar Rover vessel, for some unfortunate users. It will also insure full compatibility with the Orbiter version 2010-P1.
As you can see on this picture, the docking projector of the CSM will also become really operational, thanks to the new "local lights" feature, introduced in Orbiter 2010-P1 patch.
Of course, corrections of previous patch P1 will still remain into this new patch.
ACS
A news about AMSO: Patch #2 is in preparation !
This patch will suppress a bad CTD caused by the lunar Rover vessel, for some unfortunate users. It will also insure full compatibility with the Orbiter version 2010-P1.
As you can see on this picture, the docking projector of the CSM will also become really operational, thanks to the new "local lights" feature, introduced in Orbiter 2010-P1 patch.
Of course, corrections of previous patch P1 will still remain into this new patch.
ACS