Puma
Member
- Joined
- Nov 5, 2008
- Messages
- 89
- Reaction score
- 2
- Points
- 8
I am simulating the Apollo 11 mission with Nassp 7 beta (the last modules)
the mission I started was the Project Apollo - NASSP\Broken Scenarios\Virtual AGC/apollo 11 launch.
everything went fine, orbit, docked...but in the MET +004:17:00 (as indicated in the docking checklist).
when I hit the 2 SIVB/LM SEP - ON (UP) the switch does not stay up, and therefore I can`t get the SIVB/LM SEP extraction...bellow is a link for a short video showing the problem:
as an attachment is the my last quick save...if any one knows how to fix it please post..Thanks!!
the mission I started was the Project Apollo - NASSP\Broken Scenarios\Virtual AGC/apollo 11 launch.
everything went fine, orbit, docked...but in the MET +004:17:00 (as indicated in the docking checklist).
when I hit the 2 SIVB/LM SEP - ON (UP) the switch does not stay up, and therefore I can`t get the SIVB/LM SEP extraction...bellow is a link for a short video showing the problem: