T+ 394 Days Engineering Log

Dantassii

HUMONGOUS IMS shipbuilder
Joined
Jul 14, 2012
Messages
508
Reaction score
20
Points
33
12 hours before our scheduled undocking with the ISS, one of our shut down power plants sent a massive short through the entire electrical system. As we were getting ready to undock and resume our mission to the Lunar Station, many modules and systems were powered at that time. A quick shutdown of all our systems and a return to external ISS power was required. After several days of testing to make sure nothing was damaged, and a replacement of the power plant that shorted out via an extra flown from up from Kennedy Space Port, we are now ready to resume our flight.

All boards are green at this time.

Remaining mission timeline is as follows:
  • T+395 days Undocking from ISS and TLI
  • T+396 days MCC #7
  • T+397 days MCC #8
  • T+398 days LOI and docking with lunar station and official end to Mission #1

PS: Power supply on my home computer shorted out while turned off sometime Thursday. Took a few days for the computer shop to verify that my mother board and other components weren't fried.

Dantassii
HUMONGOUS IMS shipbuilder
 
Top