MCC #7 was performed with no flags. MCC #8 will be delayed until we are nearly to the Moon to reduce the burn time of LOI. It is expected to take us 2 or less orbits of the Moon before we are station keeping with the Lunar Station. We will then wait until daylight before performing our final docking.

All boards are green at this time.

Remaining mission timeline is as follows:
  • T+397 days MCC #8
  • T+398 days LOI and docking with lunar station and official end to Mission #1