Zuppermati
Member
- Joined
- Feb 16, 2020
- Messages
- 30
- Reaction score
- 5
- Points
- 8
Hello everyone
I'm currently at exactly T+99h in the Apollo 11 simulation, right after opening the LM landing gears.
The checklist at this point tells you to wait for an MCC update (which I think regards the LS REFSMMAT, LGC/CMC clock, Sync, LM & CM state vectors and LGC ABORT stuff. At around T+99:03:30 I get the classic "thread started/completed" message which usually precedes a PAD update. I do get the "LM: ready for uplink?" message, but I don't get any new PAD data to copy from (I still have the old DAP data + gyro torque angles). Waiting does not help and by T+99:20:00, when you are supposed to move on to another part of the checklist, there is still no data. I wanted to know if this is normal or if I'm missing anything.
Many thanks in advance.
Regards.
I'm currently at exactly T+99h in the Apollo 11 simulation, right after opening the LM landing gears.
The checklist at this point tells you to wait for an MCC update (which I think regards the LS REFSMMAT, LGC/CMC clock, Sync, LM & CM state vectors and LGC ABORT stuff. At around T+99:03:30 I get the classic "thread started/completed" message which usually precedes a PAD update. I do get the "LM: ready for uplink?" message, but I don't get any new PAD data to copy from (I still have the old DAP data + gyro torque angles). Waiting does not help and by T+99:20:00, when you are supposed to move on to another part of the checklist, there is still no data. I wanted to know if this is normal or if I'm missing anything.
Many thanks in advance.
Regards.