- Joined
- Feb 6, 2008
- Messages
- 38,938
- Reaction score
- 3,937
- Points
- 203
- Location
- Wolfsburg
- Preferred Pronouns
- Sire
The current status of the SSU scenarios:
Scenario
|
Log message
Launch Test| WORKING
Testing Scenarios/Atlantis in orbit|WORKING
Testing Scenarios/CT-1 road test| WORKING
Testing scenarios/EDW 22 Final Approach|WORKING
Testing scenarios/EDW 22 TAEM|WORKING
Testing scenarios/EDW Entry|WORKING
Testing scenarios/FCS Checkout|WORKING
Testing scenarios/FMI33 TAEM|WORKING
Testing scenarios/KSC15 Final approach|WORKING
Testing scenarios/MLP roll-off| WORKING
Testing scenarios/Payload Latch Test|Working, Payload intersects orbiter structure
Testing scenarios/Rendezvous test scenario|WORKING
Testing scenarios/SLC-6 Launch test|Loading, Aft RCS propellants empty (Left + Right)
Testing scenarios/STS-1 T-45s|WORKING - Brown tank intentional?
Testing scenarios/STS-126 T-1m| WORKING
Testing scenarios/Tanking Test scenario|WORKING
Historic missions/Death Star Flights (STS 61-F)|WORKING
Historic missions/Death Star Flights (STS 61-G)|WORKING
Historic missions/STS-1/On-orbit|WORKING
Historic missions/STS-1/STS-1 L-10 minutes|WORKING, Brown tank
Historic missions/STS-61G/Atlantis on Orbit|WORKING
Historic missions/STS-61G/L-10 minutes|WORKING
Historic missions/STS-62B/STS-62B T-45s|WORKING
Historic missions/STS-107/De-orbit|WORKING
Historic missions/STS-107/Entry Interface|WORKING
Historic missions/STS-107/Post-insertion PLBD opening|WORKING
Historic missions/STS-107/STS-107 launch scenario|WORKING
Historic missions/STS-120/STS-120 L-10 minutes|WORKING
Historic missions/STS-126/STS-126 docking with ISS Nov 16|WORKING
Historic missions/STS-126/STS-126 launch|WORKING
Compiling works after the Update of Visual Studio 2013... not sure why.
Launch Test| WORKING
Testing Scenarios/Atlantis in orbit|WORKING
Testing Scenarios/CT-1 road test| WORKING
Testing scenarios/EDW 22 Final Approach|WORKING
Testing scenarios/EDW 22 TAEM|WORKING
Testing scenarios/EDW Entry|WORKING
Testing scenarios/FCS Checkout|WORKING
Testing scenarios/FMI33 TAEM|WORKING
Testing scenarios/KSC15 Final approach|WORKING
Testing scenarios/MLP roll-off| WORKING
Testing scenarios/Payload Latch Test|Working, Payload intersects orbiter structure
Testing scenarios/Rendezvous test scenario|WORKING
Testing scenarios/SLC-6 Launch test|Loading, Aft RCS propellants empty (Left + Right)
Testing scenarios/STS-1 T-45s|WORKING - Brown tank intentional?
Testing scenarios/STS-126 T-1m| WORKING
Testing scenarios/Tanking Test scenario|WORKING
Historic missions/Death Star Flights (STS 61-F)|WORKING
Historic missions/Death Star Flights (STS 61-G)|WORKING
Historic missions/STS-1/On-orbit|WORKING
Historic missions/STS-1/STS-1 L-10 minutes|WORKING, Brown tank
Historic missions/STS-61G/Atlantis on Orbit|WORKING
Historic missions/STS-61G/L-10 minutes|WORKING
Historic missions/STS-62B/STS-62B T-45s|WORKING
Historic missions/STS-107/De-orbit|WORKING
Historic missions/STS-107/Entry Interface|WORKING
Historic missions/STS-107/Post-insertion PLBD opening|WORKING
Historic missions/STS-107/STS-107 launch scenario|WORKING
Historic missions/STS-120/STS-120 L-10 minutes|WORKING
Historic missions/STS-126/STS-126 docking with ISS Nov 16|WORKING
Historic missions/STS-126/STS-126 launch|WORKING
Compiling works after the Update of Visual Studio 2013... not sure why.
Last edited: