The first 14 shaping burns were performed today without any issued with the EHEs. Several loose items rattled around inside of 1 of the maintenance modules which caused some damage to fixtures inside the module, but no hull penetration occurred.

It is expected that we will perform 10-16 shaping burns of 2 to 5 minutes each over the next 15 days until our EOI burn on T+375 Days in the mission.

All boards are green at this time.

Remaining mission timeline is as follows:
  • T+375 days EOI and docking with ISS
  • T+390 days Undocking and TLI
  • T+393 days LOI and docking with lunar station and official end to mission #1