T+ 21 Days Engineering Log

Dantassii

HUMONGOUS IMS shipbuilder
Joined
Jul 14, 2012
Messages
508
Reaction score
20
Points
33
EHE #3 is still showing some minor issues during testing so it will not be used for the JOI burn. We are hoping we can repair it during our 5 day stay at Europa Station.

MCC #3 was performed yesterday with no additional problems. Total delta V for MCC #3 was 672 m/s. Our trajectory is such that a 17 minute burn of our remaining EHEs will allow us to arrive at Europa one quarter of an orbit after JOI at which point a 5 minute burn of our remaining EHEs will put us into orbit around Europa. A small burn using 4 EHEs will be required to boost us into a transfer orbit to the L2 point where Europa Station is with another small burn to bring us into station keeping.

Our schedule was given 5 days at Europa Station to transfer our passengers, perform any minor repairs, and refuel. Most of the time will be spent in the later process as we will have used a significant amount of our fuel to go from the Lunar Station to the Europa Station in 25 days and we will need a full fuel load to get from Europa Station to Saturn in 99 days.

The remaining milestones for this mission:
  • T+24 Days JOI burn
  • T+25 Days Arrival at Europa Station
  • T+30 Days Depart Europa Station for a sling shot around Jupiter
  • T+31 Days Trans Saturn Injection (TSI) burn during slingshot around Jupiter
  • T+45 Days MCC #4
  • T+75 Days MCC #5
  • T+105 Days MCC #6
  • T+130 Days Saturn Orbit Injection (SOI) burn
  • T+145 Days Arrival at Titan and begin construction of Titan Station
  • T+295 Days Departure from Titan Station
  • T+315 Days MCC #7
  • T+350 Days MCC #8
  • T+375 Days MCC #9
  • T+395 Days Arrival at Lunar Station and end of SSTV-01 Mission #2
Dantassii
HUMONGOUS IMS shipbuilder
 
Top