T minus 1 day until we undock from the newly completed Europa L2 Station and begin our trip back to the Lunar Station. SSTV-01 is fully fueled and all provisions have been topped off. As the L2 station is able to produce all the food and life support required for its crew, we have shut down all unnecessary life support and hydroponics modules on SSTV-01. They will remain shut down until we have docked with the Lunar Station 134 days from now.
All the EHEs have been tested and are ready for use in our TEI burn. Our burn to leave Europa and any phasing burns we need to do once in orbit around Jupiter will be done with 4 to 6 EHEs. Only our TEI and LOI burns will be performed with all 17 EHEs. All MCCs during the return home will be done using 4 EHEs although we may vary which ones we use to give them all some burn time.
All boards are green at this time.
Remaining mission timeline is as follows:
HUMONGOUS IMS shipbuilder
All the EHEs have been tested and are ready for use in our TEI burn. Our burn to leave Europa and any phasing burns we need to do once in orbit around Jupiter will be done with 4 to 6 EHEs. Only our TEI and LOI burns will be performed with all 17 EHEs. All MCCs during the return home will be done using 4 EHEs although we may vary which ones we use to give them all some burn time.
All boards are green at this time.
Remaining mission timeline is as follows:
- T+260 days SSTV-01 departs Europa L2 Station
- T+275 days TEI
- T+300 days MCC #5
- T+350 days MCC #6
- T+365 days Preliminary shaping burn for EOI
- T+375 days EOI and docking with ISS
- T+390 days Undocking and TLI
- T+393 days LOI and docking with lunar station and official end to mission #1