T+ 46 Days Engineering Log

Dantassii

HUMONGOUS IMS shipbuilder
Joined
Jul 14, 2012
Messages
508
Reaction score
20
Points
33
MCC #4 was performed yesterday with no flags. The burn providing 172 m/s of delta V was relatively small compared to initial estimates for MCC #5 and #6. All 4 EHEs uses for the burn performed nominally including EHE #3.

Due to the quickness of our Jupiter to Saturn transit, the actual delta V requirements for the 3 MCCs are difficult to calculate until the actual day of the burn. Estimated delta Vs for MCC #5 and #6 are on the order of 300 m/s at this time. We may have to perform a pre-SOI phasing burn a day before SOI although it will be difficult to calculate the delta V of this burn until we are in Saturn's gravitational sphere of influence.

Next event, MCC #5 in 30 days.

All boards are green at this time.

The remaining milestones for this mission:
  • T+62 Days Closest distance to Sun
  • T+75 Days MCC #5
  • T+105 Days MCC #6
  • T+130 Days Saturn Orbit Injection (SOI) burn
  • T+145 Days Arrival at Titan and begin construction of Titan Station
  • T+295 Days Departure from Titan Station
  • T+315 Days MCC #7
  • T+350 Days MCC #8
  • T+375 Days MCC #9
  • T+395 Days Arrival at Lunar Station and end of SSTV-01 Mission #2
Dantassii
HUMONGOUS IMS shipbuilder
 
Top