[This post has been deleted]
Last edited:
Are you okay with these solar panels? (total area = 32.943 m^2)
I think that they provide enough power for the module's necessary systems.
I already did. There's one at the front/top.
That's the RMS alignment target. The connector sockets are hidden by the four grey rectangles around the central grappling pin/cams.
Are you talking about the one that's circled? Do I only need to add just that?
No as those provide the power/data/video interfaces for the SSRMS.And would it be fine if it didn't have those things?
SSRMS is the acronym for Space Station Remote Manipulator System. SRMS is the acronym for Shuttle Remote Manipulator System.Actually, this module is not intended to be launched with a space shuttle. It will be launched with a Neptune-1b, and an arm will be attached to OSOI in a prior mission.
Yes. That is a Flight Releasable Grapple Fixture (FRGF).The picture is just a grapple fixture. For a Space Station, data transfer is everything, so a PDGF is very important...