Both the new Centaur mesh and the CISS have now been checked in.
---------- Post added at 06:01 PM ---------- Previous post was at 05:02 PM ----------
Maintenance check-in, fixed problem with Centaur that it was seriously off-center.
---------- Post added 03-03-11 at 11:27 AM ---------- Previous post was 03-02-11 at 06:01 PM ----------
I just checked in a Spacecraft3.dll version of the CISS that demonstrates the animations. I just need someone to translate it to a dedicated module that can handle the Centaur stage. Right now I have it aligned with SSU Orbiter attachment point 6.
---------- Post added at 04:31 PM ---------- Previous post was at 11:27 AM ----------
Checked in a maintenance release of the CISS. The CISS mesh was a bit of center but I have fixed this now. I also checked in a updated ini file to go with it.
---------- Post added at 08:44 PM ---------- Previous post was at 04:31 PM ----------
Almost done with the third and final stage of check ins related to the Shuttle-Centaur program, which is the FSS in its 1985 config which is was when the RBUS was added to both pads A and B.
---------- Post added 03-04-11 at 07:01 PM ---------- Previous post was 03-03-11 at 08:44 PM ----------
Third and final stage check in has been done. This the Fixed Service Structure in its 1985 config with the RBUS present. The RBUS animation is a simple two-axis translation:
SHIFT=(15.42,-1.665,0)