How much does the time change each day ?
Any wx update?
Thunder Chicken;559288[COLOR=Red said:
June 11, 2017: NICER is extracted from the SpaceX Dragon spacecraft trunk.
June 12-13: NICER is installed on the International Space Station at ELC2.
June 14: NICER is powered up and deployed. NICER’s range of motion is verified by robotic camera.
June 15: NICER executes initial pointing control test and detector initial checkout.
June 17: NICER uses raster scan of Serpens X-1 to determine X-ray instrument and star tracker alignment.
June 21-July 12: Initial calibration and hardware commissioning.
July 13: Begin NICER science program.