ORBITER-FORUM will be temporarily closed at 2026-07-23 18:00 UTC while we complete some OF maintenance tasks. The amount of downtime is expected to take up to one hour, but probably less.
How much does the time change each day ?
Any wx update?
Thunder Chicken;559288[COLOR=Red said:
June 11, 2017: NICER is extracted from the SpaceX Dragon spacecraft trunk.
June 12-13: NICER is installed on the International Space Station at ELC2.
June 14: NICER is powered up and deployed. NICER’s range of motion is verified by robotic camera.
June 15: NICER executes initial pointing control test and detector initial checkout.
June 17: NICER uses raster scan of Serpens X-1 to determine X-ray instrument and star tracker alignment.
June 21-July 12: Initial calibration and hardware commissioning.
July 13: Begin NICER science program.