GTM-3 Mission

fausto

FOI SuperMod
Joined
Jul 13, 2008
Messages
797
Reaction score
2
Points
0
Location
Monza (Milan)
gtm-3_10.jpg


GTM-3 (General Test Mission - 3) is the flight of Jarvis H rocket carrying a Verrazzano automated vehicle into lunar orbit. It will be used as a docking target for a future Antares LR spacecraft manned mission to lunar orbit scheduled for September. Mission goal is lunar orbit rendez-vous strategies testing.

MISSION SPECIFICATIONS:

Launcher: jarvis-H
Launch base: Cape Canaveral
Payload: VAS Verrazzano 29,000 kg
Vehicle mass at launch: 2,431,000 Kg
Launch date: Wednesday, April 17 at 20:55 UTC
Lunar orbit target date: Sunday, April 21 at 20:50 UTC
Launch window: 3 minutes.

In case of scrub next launch window opens Thursday, May 2nd

The entire mission will broadcasted live on Orbiter Live Missions:

http://www.livestream.com/orbiterlivemissions
 

fausto

FOI SuperMod
Joined
Jul 13, 2008
Messages
797
Reaction score
2
Points
0
Location
Monza (Milan)
rollou14.jpg


rollou15.jpg


Last Saturday Jarvis H rocket integrated with Verrazzano launcher was rolled out to its launch site (Pad J B)
Weather conditions are almost good with 65 % GO conditions. Little cloudly and small probabilities of rain. Wind within nominal values
 

IronRain

The One and Only (AFAIK)
Administrator
Moderator
News Reporter
Donator
Joined
Oct 11, 2009
Messages
3,484
Reaction score
403
Points
123
Location
Utrecht
Website
www.spaceflightnewsapi.net
I'm sorry but I will watch the replay. I really like the FOI missions but Antares will make its debut if everything goes well..
 

orb

New member
News Reporter
Joined
Oct 30, 2009
Messages
14,020
Reaction score
4
Points
0
You should really be launching Antares on the Jarvis LV today. What a coincidence that would be. :lol:
 

Therius

Donator
Donator
Joined
Mar 29, 2008
Messages
33
Reaction score
0
Points
0
I'll be tuning in the next few days. Good luck with the mission!
 

fausto

FOI SuperMod
Joined
Jul 13, 2008
Messages
797
Reaction score
2
Points
0
Location
Monza (Milan)
Lunar Orbit Insertion t - 1 day!
Fourth mid correction burn complete.
Distance from Moon 87,000 km (57,000 miles)
Tomorrow Verrazzano will enter moon gravity influence!

---------- Post added 04-21-13 at 04:07 PM ---------- Previous post was 04-20-13 at 07:39 PM ----------

Lunar Orbit insertion T - 4 h 46 min
distance from Moon: 20,000 km (13,000 miles)
velocity 1.082 km/s (0.7 miles/sec)
Perfectly on path. LOI will be performed 250 km above lunar north pole with 3000 km apoapsis. Delta V: 515 m/s

http://www.livestream.com/orbiterlivemissions

---------- Post added at 08:15 PM ---------- Previous post was at 04:07 PM ----------

LOI T- 30 minutes
 
Top